Pitts Wilson carried out the Electrical installations to eight Switch Centre’s for mobile phone provider O2. The Centre’s requirement was for virtually fail safe continuity of supply to the mobile phone networks and the installations comprised dual HV supplies, dual 1000KVa standby generators, and dual static inverter units. The centre distribution network and cabling to the distribution network was carefully planned to minimize the risk of supply loss, with all essential services having dual supplies with differing cable routes.

A complex, multi layer containment system was installed under the raised floor to allow for installation of services and sensitive data cabling.