Pitts Wilson were initially commissioned to provide the HV network and three packaged substations to the project, following our successful installation and good client relations, we were invited to carry out all the containment and process wiring to the production facility, process wiring and plc controls installation to the gypsum storage building. We installed all controls and power wiring to the conveyor system linked to the train deposit terminal. Over 35Km of power and control cable was installed with over 3000 cable terminations.