Swan Valley

Pitts Wilson were commissioned to provide a Design Build package to provide the complete electrical installation for this 428,000 sq ft distribution centre in the Midlands. The office area installation included under floor power and data cabling network for the administration staff and modular energy efficient lighting to suit the partitioned arrangement.

A total of 26 loading dock systems were installed including dock levelling, entry control systems, and lighting and power to doorways and trailers. The whole area required various methods of lighting design with general use lighting installation to the high bay area and low glare lighting to the produce racking to allow for picking and packing where required. Due to the business’s 24 hour access requirements an extensive external lighting installation to the loading area and roadway was a major component of the installation.