Pitts Wilson were appointed to provide the services installation to this Production Facility for Mars Petcare. The client was extending the existing production facility with 2 new build 25,000ft extensions. Pictured above is one of the service corridors showing the Main Panel, primary and secondary containment. This client has a strict quality and standards regime requiring all electrical containment to be coloured yellow. Energy Conservation features of this project included LED external lighting. The emergency lighting utilised the general lighting with battery back up provided by two static inverters. Several areas required an IP65 installation to allow for cleaning down. The existing Public Address, Intruder Alarm, CCTV and Fire Alarm systems were extended and enhanced to provide coverage of the new build areas and external areas.